Curvy Basin and Remarkables Ski Field Base Building

22 May 2019 / Case Studies

An impressive 2400m3 concrete was for the new Base Building (1600m above sea level) at the Remarkables Ski Field. Over 150m3 was coloured concrete for the decks.

PeterFell was proud to work with Allied Concrete on the Remarkables Ski Field Base Building Project.

Arrow International (NZ) Ltd

Head Contractor

Michael Wyatt Architects (MWA)

Architect

Aurecon

Structural Consultant

Cosgroves

Electrical, Mechanical and Fire Consultants

PeterFell

Colour